Air Conditioning

Air Conditioning

  • Preparing Builder work drawings
  • Preparing Shop drawings
  • Preparing Coordination drawings
  • Preparing Construction drawings
  • HVAC Ducting works
  • Sound Attenuation
  • Chilled Water Pipe Installation
  • Installation of Exhaust Fans
  • Installation of Chillers, AHU’s, FCU’s, FAHU’s
  • Installation of Package Units
  • Installation of all Ducted Split Units
  • Installation of VRF System
  • Valve Package for AHU’s, Chillers, FCU’s & Pumps
  • Installation of CHW pumps / Chemical Dosing Unit / Pressurization Units /
  • Installation of VCD/FD/NRD/Split Dampers
  • Aluminum Cladding Works (Pipe & Duct)
  • CHW Pipe Pressure Testing
  • Refrigerant Piping Works
  • Air Terminals Installation
  • Thermostat and Controllers
  • Air Balancing
  • Building Management System
  • Testing and commissioning
  • Approval Process from Authorities
  • As Built Drawings
  • Operation and Maintenance Manual