Air Conditioning
 - Preparing Builder work drawings
 
 - Preparing Shop drawings
 
 - Preparing Coordination drawings
 
 - Preparing Construction drawings
 
 - HVAC Ducting works
 
 - Sound Attenuation
 
 - Chilled Water Pipe Installation
 
 - Installation of Exhaust Fans
 
 - Installation of Chillers, AHU’s, FCU’s, FAHU’s
 
 - Installation of Package Units
 
 - Installation of all Ducted Split Units
 
 - Installation of VRF System
 
 - Valve Package for AHU’s, Chillers, FCU’s & Pumps
 
 - Installation of CHW pumps / Chemical Dosing Unit / Pressurization Units /
 
 - Installation of VCD/FD/NRD/Split Dampers
 
 - Aluminum Cladding Works (Pipe & Duct)
 
 - CHW Pipe Pressure Testing
 
 - Refrigerant Piping Works
 
 - Air Terminals Installation
 
 - Thermostat and Controllers
 
 - Air Balancing
 
 - Building Management System
 
 - Testing and commissioning
 
 - Approval Process from Authorities
 
 - As Built Drawings
 
 - Operation and Maintenance Manual